CNC machining cost calculator

See what one part really costs, materials, packaging and your time included, and what to charge. It starts with a real example: 6061 aluminium mounting bracket. Change it to yours. No signup.

Updated . Example prices checked on supplier sites the same month.

Material per part

Bar stock, sheet, plate or filament. Price it by weight or by length.

per
Time per part
min
/hr
min
/hr
Job

Setup happens once per job, so it is shared across every part.

min
/hr
parts
%

The share of the price you keep as profit. 50% means the price is twice your cost.

Example prices, October 2026. Change them to yours.

Quote for 10$367.40$36.74 per part

Quote for 10 parts

$367.40

That is $36.74 per part, with a profit of $110.22 on the job.

Material per part$3.30
Machine per part$16.67
Labour per part$2.50
Consumables per part$0.75
Setup $25.00 / 10$2.50
Cost per part$25.72
Job cost$257.18
Quote per part$36.74

Keep this recipe. Stockria saves it with your materials, so the cost updates when a price changes and each batch you make takes stock off the shelf.

Want us to set it up for you?

The example, line by line

A small CNC shop often runs repeat parts in jobs of 10 to 100. This example machines 10 brackets from 1/2 x 2 in 6061 flat bar, 3.125 in of bar each, 20 minutes on the mill per part and one 30 minute setup. Here is the batch the calculator starts with, worked out the same way. It makes 10 parts at $25.72 each.

Cost of 6061 aluminium mounting bracket, 10 parts
MaterialUsedCost
6061-T6 aluminium flat bar 1/2 x 2 in$76.07 for 72 in31.25 in$33.02
End mill wear and coolant$0.75 for 1 piece10$7.50
Labour: 50 min at $30.00/hr$25.00
Time on the machine: 3 h 20 min at $50.00/hr$166.67
Setup, 30 minutes once per job$25.00
Total for 10 parts$257.18
Cost per part$25.72
Where the example prices come from
  • 6061-T6 aluminium flat bar 1/2 x 2 in: $76.07 for 72 in, from Metals4U, checked October 4, 2026.
  • 1/4 in 3 flute end mill for aluminium: $41.22 for 1 piece, from Lakeshore Carbide, checked October 4, 2026.
  • Coolant concentrate: $62.29 for 1 gal, from AllIndustrial, checked October 4, 2026.

Prices change and shipping is extra. They are here to make the example real, not as a quote. Put your own prices in the calculator.

How this is calculated

  • Cost of each material = pack price / pack size x amount used, after the units are changed to match.
  • Cost per batch = all materials + packaging for every part + your time + time on the machine + setup or other costs. In the example: $257.18.
  • Cost per part = cost per batch / parts made. $257.18 / 10 = $25.72.
  • Price = cost per part / (1 - margin). At 30%: $36.74.

Want the reasoning behind each step, with tips for CNC machine shops? Read how to price a CNC machined part.

Frequently asked questions

How much does it cost to make a CNC machined part?

In the example on this page (6061 aluminium mounting bracket, 10 parts per batch, prices from October 2026), one part costs $25.72. That counts every material, packaging and 50 min of labour at $30.00 an hour, plus 3 h 20 min on the machine. Your cost depends on your prices and your batch size, so put in your own numbers.

What should I charge for a CNC machined part?

Divide your cost per part by 1 minus the margin you want. With a cost of $25.72 and a 30% margin, the price is $25.72 / 0.70 = $36.74. If you also sell wholesale, check that half of that price still covers your cost.

Where do the example prices come from?

From supplier product pages checked in October 2026: Metals4U, Lakeshore Carbide, AllIndustrial. Shipping is not included. The prices make the example real; they are not a quote, so change them to what you paid.

Can I save this cnc machining recipe?

Yes. Click "Save this as a recipe in Stockria". A free account opens with your materials and this part as a product made from them, costed the same way as here. When a material price changes, the cost per part changes with it.

Does this calculator change units for me?

Yes. Enter the amount you use and the pack you buy in any unit of the same kind: grams with kilos, ounces or pounds; millilitres with litres or fluid ounces; millimetres with metres, inches or feet. The calculator converts before it does the maths.