StockriaStockria

Free tool

Metal fabrication cost calculator

See what one part really costs, materials, packaging and your time included, and what to charge. It starts with a real example: steel l shelf bracket. Change it to yours. No signup.

Updated . Example prices checked on supplier sites the same month.

Material per part

Bar stock, sheet, plate or filament. Price it by weight or by length.

per
Time per part
min
/hr
min
/hr
Job

Setup happens once per job, so it is shared across every part.

min
/hr
parts
%

The share of the price you keep as profit. 50% means the price is twice your cost.

Example prices, October 2026. Change them to yours.

Quote for 20$446.14$22.31 per part

Quote for 20 parts

$446.14

That is $22.31 per part, with a profit of $133.84 on the job.

Material per part$2.38
Machine per part$2.50
Labour per part$7.00
Consumables per part$2.86
Setup $17.50 / 20$0.88
Cost per part$15.61
Job cost$312.30
Quote per part$22.31

Keep this recipe. Stockria saves it with your materials, so the cost updates when a price changes and each batch you make takes stock off the shelf.

Want us to set it up for you?

The example, line by line

Small fab shops often run 10 to 50 of a part at a time. This example makes 20 L-shaped shelf brackets, each from 20 in of 1/4 x 2 in flat bar, cut, welded, ground and painted. Here is the batch the calculator starts with, worked out the same way. It makes 20 parts at $15.61 each.

Cost of Steel L shelf bracket, 20 parts
MaterialUsedCost
A36 flat bar 1/4 x 2 in, 20 ft stick$28.56 for 20 ft400 in$47.60
Weld wire, gas, discs and paint$2.86 for 1 piece20$57.20
Labour: 4 h at $35.00/hr$140.00
Time on the machine: 2 h at $25.00/hr$50.00
Setup, 30 minutes once per job$17.50
Total for 20 parts$312.30
Cost per part$15.61
Where the example prices come from
  • A36 flat bar 1/4 x 2 in, 20 ft stick: $28.56 for 20 ft, from Bulk Metal Sales (freight or pickup extra), checked October 4, 2026.
  • MIG wire ER70S-6 .030: $56.10 for 12.5 lb, from Cyberweld, checked October 4, 2026.
  • Shielding gas refill, 80 cu ft: $75.00 for 80 cu ft, a typical local welding gas supplier price. Check yours.
  • Cut-off wheel 4.5 in: $3.15 for 1 piece, from Cyberweld, checked October 4, 2026.
  • Flap disc 4.5 in, 60 grit: $8.90 for 1 piece, from Cyberweld, checked October 4, 2026.
  • Spray enamel, 12 oz can: $8.50 for 1 piece, a typical hardware store price. Check yours.

Prices change and shipping is extra. They are here to make the example real, not as a quote. Put your own prices in the calculator.

How this is calculated

  • Cost of each material = pack price / pack size x amount used, after the units are changed to match.
  • Cost per batch = all materials + packaging for every part + your time + time on the machine + setup or other costs. In the example: $312.30.
  • Cost per part = cost per batch / parts made. $312.30 / 20 = $15.61.
  • Price = cost per part / (1 - margin). At 30%: $22.31.

Want the reasoning behind each step, with tips for metal fabrication shops? Read how to price a fabricated metal part.

Frequently asked questions

How much does it cost to make a fabricated metal part?

In the example on this page (steel l shelf bracket, 20 parts per batch, prices from October 2026), one part costs $15.61. That counts every material, packaging and 4 h of labour at $35.00 an hour, plus 2 h on the machine. Your cost depends on your prices and your batch size, so put in your own numbers.

What should I charge for a fabricated metal part?

Divide your cost per part by 1 minus the margin you want. With a cost of $15.61 and a 30% margin, the price is $15.61 / 0.70 = $22.31. If you also sell wholesale, check that half of that price still covers your cost.

Where do the example prices come from?

From supplier product pages checked in October 2026: Bulk Metal Sales (freight or pickup extra), Cyberweld, local welding gas supplier, hardware store. Shipping is not included. The prices make the example real; they are not a quote, so change them to what you paid.

Can I save this metal fabrication recipe?

Yes. Click "Save this as a recipe in Stockria". A free account opens with your materials and this part as a product made from them, costed the same way as here. When a material price changes, the cost per part changes with it.

Does this calculator change units for me?

Yes. Enter the amount you use and the pack you buy in any unit of the same kind: grams with kilos, ounces or pounds; millilitres with litres or fluid ounces; millimetres with metres, inches or feet. The calculator converts before it does the maths.

Metal fabrication Cost Calculator: Cost Per Part | Stockria